Aquaculture project RFQ checklist: what to specify before comparing farms, systems and equipment

Proposals can only be compared when every supplier quotes the same duty. This checklist lists what to specify, why each item matters, and which items need review by qualified local engineers or authorities before you rely on them.

Short answer

Specify the duty, not a product: project scale and phasing, species and life stage, site and water data, production method, then the design loads for tanks or cages, pumping, filtration, aeration and oxygen, monitoring, feed handling, waste, utilities, commissioning and the period over which you will compare lifecycle cost.

Mark what you know, what is assumed and what is unknown. Suppliers price unknowns as risk; a clear 'unknown' is better than a hidden assumption.

Items such as water treatment, effluent discharge, structures, electrical installations and permits need qualified local review. This checklist helps you prepare; it is not an engineering design.

How to build a comparable RFQ: 5 steps

  1. 1. Fix the basis of design

    Scale, phasing, species and life stage, site and water data, production method and design loads. This is the part every supplier must quote against.

  2. 2. Define the scope by package

    Go through each package in the checklist below and state what is included, what is excluded and who is responsible for each interface.

  3. 3. Mark known, assumed and unknown

    For every input say whether it is measured, assumed or unknown, and flag items that need qualified local review.

  4. 4. Set acceptance and commissioning tests

    State how performance will be measured at handover and what happens if it is not met.

  5. 5. Ask for lifecycle figures in the same format

    Installed cost, yearly energy, maintenance, spares and consumables, so offers can be compared over the same period.

Takeaway: fix the basis of design before asking for prices.

The checklist: what to specify in each package

Definition: an RFQ (request for quotation) is a written request asking suppliers to price a defined scope. 'Review' marks items that need qualified local engineering, environmental or regulatory review.

PackageWhat to specifyWhy it mattersReview
Project scaleAnnual output, peak standing biomass, phasing, budget range (minimum USD 250,000 for reviewed RFQs)Sizes everything; phasing decides what is built first—
Species and life stageSpecies, stages, harvest size, stocking and harvest scheduleSets densities, temperature band, oxygen and handling needsBiologist
Site and water dataLab water analysis, seasonal flow, temperature range, land, access, flood riskDecides intake, pre-treatment and civil worksEngineer / authorities
Production methodPond, cage, flow-through, partial reuse or RAS; intensityChanges almost the whole equipment listEngineer
Tanks, ponds or cagesNumber, volume, material, layout, independent units, moorings or linersDecides biosecurity separation and staged productionStructural engineer
Pumping and hydraulicsDesign flow, total head, duty/standby pumps, efficiencyOften the largest continuous power useEngineer
Filtration and water treatmentSolids removal, biofiltration, degassing, disinfection and their design loadsTreatment sized on assumptions is the most common mismatchEngineer
Aeration and oxygenPeak oxygen demand, aeration or oxygen method, emergency oxygenFailure here loses stock fastestEngineer
Monitoring and controlsSensors, alarms, data logging, remote access, calibrationTurns problems into alerts before losses—
Feed handlingFeed type, pellet sizes, storage, peak daily feed, dosing accuracyFeeding system sized on the peak day, not annual tonnage—
Waste managementSludge and effluent volumes, treatment, discharge or reuse routeDischarge rules can change the whole designEnvironmental review / authorities
UtilitiesPower supply and backup, water supply, heating/cooling, building servicesBackup power is often left out of scopeElectrical engineer
Commissioning and handoverFAT/SAT, performance tests, training, manuals, spares, warrantyDefines what 'finished' means—
Lifecycle costsInstalled cost, yearly energy, maintenance, spares, consumables, planning periodThe cheapest purchase can be the most expensive to own—

Takeaway: every line that is not specified becomes a difference between proposals.

Questions to ask every supplier

Send the same questions to every supplier so the answers can be compared line by line.

Design basis

  • Which biomass, feed load, temperature and water quality is the offer sized for?
  • What redundancy and safety margin are included?

Scope

  • Which packages are included, excluded or by others?
  • Who is responsible for each interface (civil, electrical, building)?

Performance and support

  • Which values will you commit to at acceptance, and how are they measured?
  • What training, spares, service and warranty are included?

Before you send: three checks

  1. 1. Is every design load (biomass, feed, flow, oxygen) stated or marked unknown?

    ✓ Suppliers can quote the same duty.

    ✗ Add them or mark them unknown — otherwise each proposal sizes a different system.

  2. 2. Is every package marked included, excluded or by others?

    ✓ Scope gaps will be visible when comparing.

    ✗ Gaps will reappear later as variations.

  3. 3. Are items needing local review identified?

    ✓ Plan who reviews them and when.

    ✗ Mark treatment, discharge, structures, electrical work and permits before relying on any proposal.

Takeaway: an RFQ with unknowns is fine — if they are marked.

Common gaps between proposals

When proposals differ widely in price, check these lines first.

LineOften missing or assumedAsk suppliers to state
Design basisBiomass, feed load or temperature different from your briefThe exact design values the offer is sized for
RedundancyNo standby pumps or blowers, no emergency oxygenWhich failures the system tolerates
Backup powerExcluded or 'by others'Generator size, transfer and what it covers
Civil and building interfaceFoundations, drainage, insulation excludedExact scope boundary and interface drawings
CommissioningOnly delivery, no performance tests or trainingTests, training days, manuals and spares included
Running costsNo energy or maintenance figuresInstalled kW, yearly maintenance and spares

Takeaway: the cheapest proposal often excludes something on this list.

Compare two proposals over their lifecycle

Enter installed cost and yearly running cost from two written proposals. The result is undiscounted arithmetic over your chosen period.

Proposal A lifecycle cost
$780,000
Proposal B lifecycle cost
$680,000
Difference (B − A)
-$100,000
Years until the cheaper-to-run proposal catches up
3

Formula: lifecycle cost = purchase and installation + yearly operating cost × years. Undiscounted; excludes biological effects (survival, growth, FCR), which you should assess separately.

Send this comparison with a project brief

Illustrative example (hypothetical numbers)

Proposal A: USD 420,000 installed and USD 55,000 a year to run. Proposal B: USD 470,000 installed and USD 42,000 a year. Over 10 years: A = 420,000 + 55,000 × 10 = USD 970,000; B = 470,000 + 42,000 × 10 = USD 890,000. B costs USD 50,000 more up front but is USD 80,000 lower over the period, catching up after about 3.8 years. These numbers are invented for illustration; use the figures from your own written proposals.

Takeaway: compare proposals over years, not on day one.

Free tools to fill in the checklist

These calculators help you estimate the design loads the RFQ needs. They give planning estimates only.

How to use this checklist

  • This checklist structures your request. It is not an engineering design, and it does not guarantee price, performance, survival, growth or yield.
  • Items marked for review — water treatment, effluent, structures, electrical installations and permits — must be checked by qualified local engineers and the relevant authorities.
  • FishMatch Group is supplier-neutral. Buyers can use the tools free; our team reviews and organises the RFQ and then contacts suitable suppliers on the buyer's behalf. Buyers are not connected directly with manufacturers.

Payments, financing and avoidable mistakes

  • Link payments to verifiable milestones — design approval, factory acceptance, delivery, installation, site acceptance — rather than to calendar dates.
  • Lenders often ask for the same basis of design and scope; a complete RFQ file supports that discussion but does not guarantee financing.
  • Mistake: sending a product list instead of a duty, so every supplier sizes a different system.
  • Mistake: comparing proposals on price without checking excluded packages.
  • Mistake: leaving commissioning tests and acceptance criteria undefined.

Takeaway: payments should follow proven milestones.

Final check before sending the RFQ

  • Scale, phasing and budget range stated (reviewed RFQs start at USD 250,000)
  • Species, life stage, harvest size and schedule stated
  • Water analysis, seasonal flow and temperature range attached or marked unknown
  • Production method and intensity stated
  • Design loads stated: peak biomass, peak feed, flow, oxygen
  • Every package marked included, excluded or by others
  • Redundancy, backup power and emergency oxygen requirements stated
  • Waste and discharge route stated and marked for local review
  • Commissioning tests, training, manuals, spares and warranty requested
  • Lifecycle cost figures requested in the same format from every supplier

Takeaway: this is the minimum for comparable proposals.

Frequently asked questions

Ready to send a comparable RFQ?

Use the free calculators to fill in the design loads, then start a project brief. For projects of at least USD 250,000, our team reviews the RFQ, contacts suitable suppliers for you and organises their responses. Smaller projects get planning guidance and tools.

Sources and further reading

Last reviewed: October 2026. Examples use stated hypothetical inputs; no supplier prices, performance benchmarks or outcomes are claimed.