South Asia · Shrimp Vertical

Shrimp Farming Equipment & Suppliers in Sri Lanka

FishMatch is the private sourcing concierge for shrimp producers in Sri Lanka. We match buyers in Puttalam, Chilaw, Batticaloa, North Western Province with verified global suppliers of L. vannamei & P. monodon hatchery systems, RAS, aerators, biofloc kits, feed and processing — under full confidentiality.

Financing requests are submitted to independent third-party providers. Eligibility, terms and approval are decided solely by them; approval is not guaranteed.
Hatchery, nursery, grow-out and RAS equipment
L. vannamei & P. monodon broodstock and PL sourcing partners
Biofloc, paddlewheel & aspirator aeration
Feed (starter, grower, finisher) & probiotics
Cold-chain, IQF and processing lines for export via Colombo, Hambantota
Financing requests to independent providers — leasing, trade finance, project debt
Confidential supplier matching
Active in South Asia
Financing partners project-matched

Why Sri Lanka

Sri Lanka is one of the global shrimp powerhouses, with production concentrated in Puttalam, Chilaw, Batticaloa, North Western Province and exports flowing through Colombo, Hambantota. Buyers face fragmented supplier markets, opaque pricing and language barriers — FishMatch removes all three.

What we source

Complete grow-out and hatchery turn-key projects, RAS and biofloc retrofits, aeration, water treatment, automatic feeders, oxygen generators, plus broodstock and post-larvae partners. We do not publish supplier names; matches are private to each request.

Financing layer

Every shrimp project on our desk can be paired with international financing: equipment leasing, ECA-backed buyer credit, trade finance (LC/SBLC) and working capital. Tickets importi definiti dal finanziatore. We are not a lender — we connect you with regulated partners.

Get Free Private Quotes

Talk to a shrimp specialist

Smart questions

Fish farm project details

Lets suppliers scope tanks, cages, aeration, feeders and water treatment for your species and site.

Documents that help us quote faster

Optional — you can email them after or bring them to the first call. Uploads are private and encrypted.

  • Site photos or coordinates
  • Water analysis (DO, pH, temperature, ammonia)
  • Existing licenses / aquaculture permits
  • Business plan or feasibility summary (if available)
Aquaculture project details (optional)

Tell suppliers what they need to quote accurately

The more complete your aquaculture project details are, the faster suitable partners can understand your request and respond with realistic options. Leave anything you do not know yet blank — nothing here is required.

Not sure what to write? Answer a few quick questions and we'll draft the brief for you.

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Financing Disclaimer: FishMatch Group is not a lender, bank, financial institution, credit provider, investment advisor, or regulated financial services provider. Financing options, where available, are offered exclusively by independent third-party providers. Financing is not guaranteed. See Terms.

Size your harvest vacuum before you request quotes

Embedded tool

Shrimp Harvest Vacuum & Pump Sizing

Shrimp harvest vacuum (fish pump) systems are specified by live product throughput, the water carried with the product, hose diameter, lift height and the vacuum level the pump must hold without damaging the animals. Size the duty here, then request comparable quotes on the same spec.

Shorter windows raise pump size and cooling/ice demand.

2–4 typical for vannamei; gentler handling needs more water.

1.5–2.0 m/s keeps shrimp intact; above 2.5 m/s raises damage.

Required throughput
4 t/hr
12,000 kg in 3 h
Total pumped flow
16 m³/hr
12 m³/hr water + 4 m³/hr product
Hose / pipe diameter
56 mm
At 1.8 m/s design velocity — round up to the next standard size
Vacuum level required
0.51 bar
≈ 382 mmHg — static lift 4 m plus hose friction
Total dynamic head
7.2 m
Lift + hose friction + discharge allowance
Installed pump power
0.7 kW
Shaft 0.5 kW at 60% efficiency + 25% margin

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. FishMatch Group does not provide automatic buyer-supplier introductions. Every aquaculture project request is reviewed manually by David / FishMatch Group, and supplier introductions are made only after internal approval.

FAQ

Import & export documentation checklist for Sri Lanka

Work through this list before you place an equipment order or ship finished product through Colombo, Hambantota. Missing paperwork is the most common cause of demurrage, delayed commissioning and rejected consignments.

Importing equipment into Sri Lanka

  • Commercial invoice and packing list matching the purchase order line by line
  • Bill of lading or air waybill with correct consignee and notify party
  • Certificate of origin and confirmed HS classification for each machine
  • Import permit or licence where the product category requires one
  • CE or equivalent conformity declaration, plus electrical rating matched to local voltage/frequency
  • Operating manuals, wiring diagrams and recommended spare-part list
  • Insurance certificate and agreed Incoterm (FOB / CIF / DAP)
  • Veterinary or sanitary certificate for live animals, feed and biologicals

Exporting shrimp product from Sri Lanka

  • Health / sanitary certificate from the competent authority
  • Farm or establishment registration and approval number
  • HACCP plan and traceability records per production lot
  • Certificate of origin and any preferential-trade documentation
  • Residue and antibiotic test reports for EU / US / Japan buyers
  • Cold-chain temperature logs from harvest to container loading
  • Container stuffing report, seal numbers and phytosanitary annexes where required

Indicative list for planning only — always confirm current requirements with your customs broker and the competent authority in Sri Lanka.

FishMatch Group is a private sourcing concierge, not a lender, bank or financial institution. Supplier identities are kept confidential. Financing is subject to third-party approval.

Other languages

Short answer

What is the fastest way to get quotes for Sri Lanka?

Submit one structured request for Sri Lanka. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer
Get Free QuotesFinancing