RAS sourcing
RAS system suppliers for fish and shrimp farms
The RAS supplier you choose decides how your farm runs for the next 15 years. This page explains what to check before buying a recirculating aquaculture system and how FishMatch Group handles a RAS request. A person reviews every request. Supplier identities stay private.
How do you choose a RAS system supplier?
Choose a RAS supplier on running reference farms, a written design basis and a clear scope of supply, not on price per tonne alone. Ask for farms with the same species and a similar size, the feed load and stocking density the system is sized for, exactly what is included (filtration, biofilter, oxygen, pumps, controls, installation, start-up), and who supports the farm after handover.
What to check before you choose a RAS supplier
Reference farms
Running farms with the same species and a similar size, which you can visit or call. A design on paper is not a reference.
Design basis
The feed load, stocking density and water exchange the system is sized for. Without these, two quotes cannot be compared.
Scope of supply
What is included: tanks, drum filters, biofilters, oxygen, pumps, controls, building, installation and start-up. Gaps here become extra costs later.
Start-up and support
Who commissions the biofilter, trains your team and answers the phone in year two. Ask for spare parts lead times in writing.
Related pages
What to compare across RAS quotations
RAS quotes rarely cover the same scope. Put each one in this table before you compare prices; FishMatch Group does the same normalisation when it reviews proposals for you.
| Item | Why it matters | Ask each supplier for | Red flag |
|---|---|---|---|
| Design basis | Two systems sized for different feed loads are not comparable | Peak daily feed, stocking density, species and temperature used | No design basis stated |
| Scope of supply | Missing items become change orders | Line-by-line list: tanks, filters, biofilter, oxygen, pumps, controls, install | 'Optional' items that the farm cannot run without |
| Redundancy | One failed pump or blower can lose a crop | Backup pumps, blowers, oxygen and power, and alarm design | No backup for oxygen or power |
| Start-up and support | Biofilter start-up and training decide the first harvest | Commissioning days, training, spare-parts lead times, support contact | Support only from another time zone with no local partner |
| Reference farms | Shows the design has run, not just been drawn | Running farms with similar species and size you can contact | Only renderings or pilot units |
General buyer guidance, not a recommendation of any supplier. FishMatch Group is a buyer-side sourcing service, not a manufacturer.
Get comparable quotes in 3 steps
- 1
Describe your project
Species, target output, site and budget range. Rough numbers are fine.
- 2
We review and structure it
A person checks your request and turns it into a comparable RFQ. Procurement help is for projects of USD 250,000 and above.
- 3
Compare proposals
You receive proposals on the same basis. Supplier identities stay private until you choose to proceed.
Short answer
How do you prepare a reviewed RFQ for RAS Suppliers?
Submit a private request for RAS Suppliers with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer
Before you request quotes
Equipment scope
What equipment does a commercial aquaculture project actually need?
A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.
Which equipment should be specified before requesting quotes?
Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.
Can equipment be sourced in stages?
Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.
Supplier selection criteria
How should a buyer compare aquaculture suppliers?
Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.
What are the warning signs in a supplier quotation?
Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.
How does FishMatch handle supplier selection?
FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.