All projects in planning

In planning with FishMatch

1,200-tonne tilapia farm in Côte d'Ivoire

Côte d'Ivoire · Integrated above-ground fish farm

An integrated above-ground tilapia farm planned for 1,200 tonnes a year, supplied by borehole water through a water tower. The project is in planning with FishMatch and is preparing to request comparable supplier proposals.

Annual output
1,200 tonnes
Species
Tilapia
Stocking density
100 fish per m³ (planned)
Water source
Borehole with water tower
Water flow
100 (owner's planning figure)
Treatment
Borehole water, no treatment planned yet

Equipment to be sourced

  • • Ponds, tanks or cages
  • • Aeration
  • • Water pumps
  • • Feed storage and delivery
  • • Harvest gear
  • • Backup power

Budget areas

  • • Civil works
  • • Aeration
  • • Feed
  • • Fingerlings
  • • Backup power
  • • Contingency

Readiness checklist

  • • Aquaculture licence
  • • Water rights
  • • Fingerling supplier
  • • Feed contract
  • • Market off-take

Financing being considered

  • • Term loan
  • • Government aquaculture grants

Shown with the owner's permission. This project is at the planning stage — figures are the owner's plan, not results or supplier quotes.

Planning a similar project?

Send one structured brief and receive comparable supplier proposals.

Start your project RFQ

Short answer

How do you build and equip a project for Cote Divoire Tilapia Farm 1200t?

For Cote Divoire Tilapia Farm 1200t, confirm water, energy, site rights, permits and logistics before choosing equipment. FishMatch Group helps structure the project RFQ and review independent proposals case by case; it does not approve feasibility, build or operate the farm. Obtain current local advice and written supplier terms. A country page does not establish local supplier availability, commissioning capacity or a project price.

What decides feasibility:
Water availability, energy cost, permitting and route to market
Sourcing:
Candidate capability and regional service evidence require case-by-case review
Landed cost:
Request separate freight, duties and installation figures; inclusion is not assumed
Cost to buyers:
No fee charged to the buyer
How do you build and equip a project for Cote Divoire Tilapia Farm 1200t?

For Cote Divoire Tilapia Farm 1200t, confirm water, energy, site rights, permits and logistics before choosing equipment. FishMatch Group helps structure the project RFQ and review independent proposals case by case; it does not approve feasibility, build or operate the farm. Obtain current local advice and written supplier terms. A country page does not establish local supplier availability, commissioning capacity or a project price.

How does FishMatch Group source suppliers for this requirement?

Submit a private RFQ with the country, product or project scope, capacity or volume and timing. The FishMatch team reviews it, clarifies missing details and researches independent providers before approved outreach. Any received proposals are compared on the same scope; FishMatch is not the supplier, manufacturer, contractor or operator, and does not guarantee a response or outcome.

Do buyers see supplier names during the sourcing process?

No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.