Oxygen demand in intensive fish culture follows feed: the fish need oxygen to digest what they eat. The recirculating aquaculture textbook by Timmons, Ebeling et al. (NRAC Publication 01-002) uses about 0.25 kg of oxygen per kg of feed as a design rule. Enter your daily feed and, if your system designer uses a different figure, change it.
তথ্য দিন
ফলাফল
দৈনিক O₂ চাহিদা
25 kg/day
Average hourly O₂ demand
1.04 kg/hr
Peak demand after feeding is higher than this average — your system designer sets the peak and backup margin.
পরিকল্পনা নোট
Source: Timmons, M.B., Ebeling, J.M. et al., Recirculating Aquaculture Systems, 2nd ed., NRAC Publication 01-002 (2002) — about 0.25 kg O₂ per kg feed.
This is the fish's oxygen use only. For oxygen transfer efficiency, yearly tonnage and LOX cost, use the Commercial Oxygen Demand & LOX Cost Calculator.
এগুলি আনুমানিক পরিকল্পনা সংখ্যা, কোনো নিশ্চয়তা নয়। অনুবাদ স্বয়ংক্রিয় — কিছু বিস্তারিত ইংরেজিতে থাকতে পারে।