বায়োফিল্টার আকার নির্ণয় ক্যালকুলেটর
The biofilter is the heart of every RAS: it must convert the ammonia (TAN) your fish excrete into nitrate around the clock. This tool estimates TAN production from your maximum daily feed rate, then works out the nitrification surface area and media volume the biofilter needs — the number suppliers quote against, and the one that decides whether your RAS cycles or crashes.
তথ্য দিন
ফলাফল
TAN উৎপাদন
19,320 g/day
32.2 g TAN per kg feed at 35% protein
Design TAN load (with 30% peak margin)
25,116 g/day
Peak feeding and biomass swings
Nitrification surface area needed
62,790 m²
At 0.4 g TAN/m²/day
Media volume needed
125.6 m³
500 m²/m³ protected surface area
Alkalinity consumed
139 kg CaCO₃/day
≈7.2 g CaCO₃ per g TAN — check your make-up and buffering
পরিকল্পনা নোট
- Source: Timmons, M.B., Ebeling, J.M. et al., Recirculating Aquaculture Systems, 2nd ed., NRAC Publication 01-002 (2002) — TAN = feed × protein × 0.092 (about 32 g TAN per kg feed at 35% protein). Actual excretion varies with digestibility and species, so treat it as a planning figure.
- Nitrification rates fall in cold or low-alkalinity water; systems running below 20 °C or above 15 ppt salinity need supplier-confirmed rates.
- Biofilters also carry BOD from dissolved organics — heterotrophic bacteria can smother nitrifying media if solids removal is undersized.
- Confirm the supplier's tested nitrification rate and protected media area before purchase. Nitrification also consumes oxygen — check the Commercial Oxygen Demand and Energy Cost calculators before comparing RAS quotes.
এগুলি আনুমানিক পরিকল্পনা সংখ্যা, কোনো নিশ্চয়তা নয়। অনুবাদ স্বয়ংক্রিয় — কিছু বিস্তারিত ইংরেজিতে থাকতে পারে।