← All calculators
Aquaculture tool · Professional edition

Operating Cost (OPEX) Calculator

OPEX drives profitability more than CAPEX for most farms. This tool sums the major operating costs — feed, electricity, labor, fingerlings, water and maintenance — and expresses the total as $/month and $/kg produced.

Scenario modelling

Flexes feed, energy, labor and overheads — the four dominant OPEX lines.

Calculator inputs

Results

Total monthly OPEX
$41,360
2.76 $/kg produced
Feed
$26,400
64% of OPEX
Energy
$2,700
7% of OPEX
Labor + fingerlings + other
$12,260

Estimates Only: This calculator is provided for general informational purposes only. Results are approximate and may contain errors, omissions, or outdated information. They do not constitute legal, financial, engineering, tax, technical, or professional advice. Users are solely responsible for independently verifying all calculations, specifications, prices, regulations, and requirements with qualified professionals before making any decisions. By using this calculator, you acknowledge that the website owners, operators, and affiliates accept no responsibility or liability for any loss, damage, or decisions resulting from its use.

Turn this result into 1–3 supplier quotes

Send this spec privately to selected manufacturers.

FishMatch Group reaches out on your behalf — your name, project and location stay confidential until you accept a quote. No sign-up, no listing fees, buyers never pay.

How supplier matching works

  1. 1. Private brief. Your spec goes only to manufacturers we have selected for the right category, capacity and export experience.
  2. 2. Confidential outreach. Suppliers see the technical spec — not your name, company or exact location — until you accept a quote.
  3. 3. 1–3 comparable quotes. Typically within 5–10 business days, aligned on scope so you can compare like-for-like.
  4. 4. Financing intro (optional). If needed, we introduce your project to a financing partner. No fee to buyers.

Notes

  • Feed is typically 40–65% of OPEX. Energy 8–20%. Labor 10–25%.
  • Solar PV can cut the energy line 30–90% — see the Solar ROI calculator.
Get Free QuotesFinancing