← All calculators
Aquaculture tool · Professional edition

Commercial Aquaculture ROI & IRR Calculator

Investor-grade returns model for commercial aquaculture: annual EBITDA, payback, levered IRR estimate and Debt-Service Coverage Ratio (DSCR). Accounts for equity/debt split, interest, tax and a realistic 3-year ramp-up.

Scenario modelling

Flexes CAPEX, production, price, OPEX and interest — the five drivers of every commercial aquaculture DCF.

Calculator inputs

Results

DSCR (steady-state)
2.75×
Bankable (≥1.3×)
Levered IRR (10-yr proxy)
33.3%
Ramp-adjusted return on equity
Annual EBITDA
$2,300,000
Revenue $5,500,000 · OPEX $3,200,000
Annual debt service
$835,271
Debt $4,800,000 · 8.0% / 8y
Net profit after tax
$1,171,783
Tax @ 20%
Equity payback
2.7 years

Estimates Only: This calculator is provided for general informational purposes only. Results are approximate and may contain errors, omissions, or outdated information. They do not constitute legal, financial, engineering, tax, technical, or professional advice. Users are solely responsible for independently verifying all calculations, specifications, prices, regulations, and requirements with qualified professionals before making any decisions. By using this calculator, you acknowledge that the website owners, operators, and affiliates accept no responsibility or liability for any loss, damage, or decisions resulting from its use.

Turn this result into 1–3 supplier quotes

Send this spec privately to selected manufacturers.

FishMatch Group reaches out on your behalf — your name, project and location stay confidential until you accept a quote. No sign-up, no listing fees, buyers never pay.

How supplier matching works

  1. 1. Private brief. Your spec goes only to manufacturers we have selected for the right category, capacity and export experience.
  2. 2. Confidential outreach. Suppliers see the technical spec — not your name, company or exact location — until you accept a quote.
  3. 3. 1–3 comparable quotes. Typically within 5–10 business days, aligned on scope so you can compare like-for-like.
  4. 4. Financing intro (optional). If needed, we introduce your project to a financing partner. No fee to buyers.

Notes

  • Commercial lenders typically require DSCR ≥ 1.3× and equity ≥ 30–40%.
  • This is an indicative model — production financing needs a full DCF with biological risk, price sensitivity and mortality scenarios.
  • Pair with the Financing / Loan Amortization calculator for month-by-month cashflow.
Get Free QuotesFinancing