Commercial Aquaculture CAPEX Estimator

Rapid CAPEX for a commercial fish farm, shrimp farm, RAS plant or sea-cage project. Sizes total investment from target production, applies system-specific CAPEX/kg benchmarks, then breaks it into the six lines every bank wants: land & civil, process equipment, engineering & permitting, working capital, contingency and financing costs.

Scenario modelling

Stress-tests the six variables lenders sensitize on commercial aquaculture: capacity, country cost, engineering, contingency, working capital and unit OPEX.

Calculator inputs

Drives base CAPEX per tonne of annual capacity.

Feed + energy + labor + overhead per kg.

Results

Total indicative CAPEX
$13,291,200
$13 / kg capacity
Process equipment
$6,600,000
Tanks, RAS loop, aeration, filtration, feeders, controls
Land, civil & buildings
$3,600,000
Site works, ponds, cages, hatchery, hall
Engineering & permitting
$792,000
12% of equipment
Contingency
$1,099,200
10% of hard costs
Working capital
$1,200,000
6 months of OPEX

Estimates Only: This calculator is provided for general informational purposes only. Results are approximate and may contain errors, omissions, or outdated information. They do not constitute legal, financial, engineering, tax, technical, or professional advice. Users are solely responsible for independently verifying all calculations, specifications, prices, regulations, and requirements with qualified professionals before making any decisions. By using this calculator, you acknowledge that the website owners, operators, and affiliates accept no responsibility or liability for any loss, damage, or decisions resulting from its use.

Turn this result into 1–3 supplier quotes

Send this spec privately to selected manufacturers.

FishMatch Group reaches out on your behalf — your name, project and location stay confidential until you accept a quote. No sign-up, no listing fees, buyers never pay.

How supplier matching works

  1. 1. Private brief. Your spec goes only to manufacturers we have selected for the right category, capacity and export experience.
  2. 2. Confidential outreach. Suppliers see the technical spec — not your name, company or exact location — until you accept a quote.
  3. 3. 1–3 comparable quotes. Typically within 5–10 business days, aligned on scope so you can compare like-for-like.
  4. 4. Financing intro (optional). If needed, we introduce your project to a financing partner. No fee to buyers.

Notes

  • Bank-grade CAPEX also includes IDC (interest during construction), insurance and start-up losses — add 3–8%.
  • RAS: $10–18K/t. Ponds: $2.5–5K/t. Sea cages: $4–8K/t. Hybrid: $5–9K/t. Country and species swing these ±30%.
  • Feed this figure straight into the Commercial ROI and Financing (DSCR) calculators.