← All calculators
Aquaculture tool · Professional edition

Solar Pump Sizing Calculator

Solar-direct or hybrid pumps need a PV array sized to deliver the daily volume against total dynamic head (TDH). This tool converts flow × head into required kWh/day and PV kWp using pump and system efficiency.

Scenario modelling

Flexes pump efficiency, site irradiance and system losses.

Calculator inputs

Results

Hydraulic energy needed
10.9 kWh/day
PV electricity needed
26.42 kWh/day
after pump & system losses
PV array size
5.08 kWp
≈ 10 × 550 Wp panels

Estimates Only: This calculator is provided for general informational purposes only. Results are approximate and may contain errors, omissions, or outdated information. They do not constitute legal, financial, engineering, tax, technical, or professional advice. Users are solely responsible for independently verifying all calculations, specifications, prices, regulations, and requirements with qualified professionals before making any decisions. By using this calculator, you acknowledge that the website owners, operators, and affiliates accept no responsibility or liability for any loss, damage, or decisions resulting from its use.

Turn this result into 1–3 supplier quotes

Send this spec privately to selected manufacturers.

FishMatch Group reaches out on your behalf — your name, project and location stay confidential until you accept a quote. No sign-up, no listing fees, buyers never pay.

How supplier matching works

  1. 1. Private brief. Your spec goes only to manufacturers we have selected for the right category, capacity and export experience.
  2. 2. Confidential outreach. Suppliers see the technical spec — not your name, company or exact location — until you accept a quote.
  3. 3. 1–3 comparable quotes. Typically within 5–10 business days, aligned on scope so you can compare like-for-like.
  4. 4. Financing intro (optional). If needed, we introduce your project to a financing partner. No fee to buyers.

Notes

  • Add a 15–25% margin for cloudy weeks and pump wear.
  • For 24/7 pumping add battery storage — see the Battery Storage calculator.
Get Free QuotesFinancing