Küresel · Gizli Tedarik

Karides Havalandırıcıları ve Pompaları

Küresel ve gizli tedarik konsiyerji: Karides Havalandırıcıları ve Pompaları.

50M$'a kadar finansman — kredi onayına tabidir

Kapsam

Paddlewheel, propeller, aspirator and central blower aerators
Pond drainage, harvest and recirculation pumps
Energy-efficient designs with VFD options
Container-load pricing for project quantities
Tedarikçi isimleri gizli
40+ ülkeden alıcılar
Ekipman ve proje finansmanı

Nasıl çalışıyoruz

Aeration types

Paddlewheel (1-3 HP) for surface mixing, aspirators for vertical mixing, propeller aerators for circulation, and central blower + diffuser systems for high-density intensive ponds.

Pump scope

Centrifugal water pumps, axial flow pumps for high-volume low-head transfer, submersible drainage pumps, and harvest pumps for live shrimp transfer.

Sizing & power

We size aeration to 28-32 HP/ha for intensive vannamei and 12-18 HP/ha for semi-intensive. Pump sizing depends on pond layout, head and turnover targets.

Ücretsiz Teklif Al

Biz tedarik ederiz. Siz karar verirsiniz. Tedarikçi kimliği seçiminize kadar gizlidir.

Smart questions

Fish farm project details

Lets suppliers scope tanks, cages, aeration, feeders and water treatment for your species and site.

Documents that help us quote faster

Optional — you can email them after or bring them to the first call. Uploads are private and encrypted.

  • Site photos or coordinates
  • Water analysis (DO, pH, temperature, ammonia)
  • Existing licenses / aquaculture permits
  • Business plan or feasibility summary (if available)

Not sure what to write? Answer a few quick questions and our AI builds the brief for you.

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Financing Disclaimer: FishMatch Group is not a lender, bank, financial institution, credit provider, investment advisor, or regulated financial services provider. Financing options, where available, are offered exclusively by independent third-party providers. Financing is not guaranteed. See Terms.

SSS

FishMatch Group bağımsız bir tedarik konsiyerjidir, banka veya kredi kuruluşu değildir. Finansman, lisanslı ortaklar aracılığıyla düzenlenir ve kredi onayına tabidir.

Get Free QuotesFinancing