Global · Vertrauliches Sourcing

Belüfter und Pumpen für Garnelen

Globaler vertraulicher Sourcing-Concierge für Belüfter und Pumpen für Garnelen.

Finanzierung bis $50M — vorbehaltlich Kreditprüfung

Was enthalten ist

Paddlewheel, propeller, aspirator and central blower aerators
Pond drainage, harvest and recirculation pumps
Energy-efficient designs with VFD options
Container-load pricing for project quantities
Lieferantennamen vertraulich
Käufer in 40+ Ländern
Anlagen- und Projektfinanzierung

So arbeiten wir

Aeration types

Paddlewheel (1-3 HP) for surface mixing, aspirators for vertical mixing, propeller aerators for circulation, and central blower + diffuser systems for high-density intensive ponds.

Pump scope

Centrifugal water pumps, axial flow pumps for high-volume low-head transfer, submersible drainage pumps, and harvest pumps for live shrimp transfer.

Sizing & power

We size aeration to 28-32 HP/ha for intensive vannamei and 12-18 HP/ha for semi-intensive. Pump sizing depends on pond layout, head and turnover targets.

Kostenlose Angebote anfordern

Wir beschaffen. Sie entscheiden. Lieferantenidentität bleibt privat bis zur Auswahl.

Smart questions

Fish farm project details

Lets suppliers scope tanks, cages, aeration, feeders and water treatment for your species and site.

Documents that help us quote faster

Optional — you can email them after or bring them to the first call. Uploads are private and encrypted.

  • Site photos or coordinates
  • Water analysis (DO, pH, temperature, ammonia)
  • Existing licenses / aquaculture permits
  • Business plan or feasibility summary (if available)

Not sure what to write? Answer a few quick questions and our AI builds the brief for you.

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Financing Disclaimer: FishMatch Group is not a lender, bank, financial institution, credit provider, investment advisor, or regulated financial services provider. Financing options, where available, are offered exclusively by independent third-party providers. Financing is not guaranteed. See Terms.

FAQ

FishMatch Group ist ein unabhängiger Sourcing-Concierge, keine Bank und kein Kreditgeber. Finanzierungen werden über lizenzierte Partner vermittelt, vorbehaltlich Kreditprüfung.

Get Free QuotesFinancing