Глобально · Конфиденциальные закупки

Аэраторы и насосы для креветок

Глобальный конфиденциальный консьерж по закупкам: Аэраторы и насосы для креветок.

Финансирование до $50М — по решению кредитора

Что входит

Paddlewheel, propeller, aspirator and central blower aerators
Pond drainage, harvest and recirculation pumps
Energy-efficient designs with VFD options
Container-load pricing for project quantities
Имена поставщиков конфиденциальны
Покупатели в 40+ странах
Финансирование оборудования и проектов

Как мы работаем

Aeration types

Paddlewheel (1-3 HP) for surface mixing, aspirators for vertical mixing, propeller aerators for circulation, and central blower + diffuser systems for high-density intensive ponds.

Pump scope

Centrifugal water pumps, axial flow pumps for high-volume low-head transfer, submersible drainage pumps, and harvest pumps for live shrimp transfer.

Sizing & power

We size aeration to 28-32 HP/ha for intensive vannamei and 12-18 HP/ha for semi-intensive. Pump sizing depends on pond layout, head and turnover targets.

Получить бесплатные предложения

Мы ищем. Вы решаете. Имена поставщиков остаются конфиденциальными до вашего выбора.

Smart questions

Fish farm project details

Lets suppliers scope tanks, cages, aeration, feeders and water treatment for your species and site.

Documents that help us quote faster

Optional — you can email them after or bring them to the first call. Uploads are private and encrypted.

  • Site photos or coordinates
  • Water analysis (DO, pH, temperature, ammonia)
  • Existing licenses / aquaculture permits
  • Business plan or feasibility summary (if available)

Not sure what to write? Answer a few quick questions and our AI builds the brief for you.

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Financing Disclaimer: FishMatch Group is not a lender, bank, financial institution, credit provider, investment advisor, or regulated financial services provider. Financing options, where available, are offered exclusively by independent third-party providers. Financing is not guaranteed. See Terms.

Вопросы и ответы

FishMatch Group — независимый консьерж по закупкам, не банк и не кредитор. Финансирование организуется через лицензированных партнёров и зависит от кредитной оценки.

Get Free QuotesFinancing