Global · Sourcing Confidencial

Aeradores e Bombas para Camarão

Concierge global e confidencial de sourcing para Aeradores e Bombas para Camarão.

Financiamento até $50M — sujeito a aprovação de crédito

O que está incluído

Paddlewheel, propeller, aspirator and central blower aerators
Pond drainage, harvest and recirculation pumps
Energy-efficient designs with VFD options
Container-load pricing for project quantities
Nomes de fornecedores confidenciais
Compradores em 40+ países
Financiamento de equipamentos e projetos

Como trabalhamos

Aeration types

Paddlewheel (1-3 HP) for surface mixing, aspirators for vertical mixing, propeller aerators for circulation, and central blower + diffuser systems for high-density intensive ponds.

Pump scope

Centrifugal water pumps, axial flow pumps for high-volume low-head transfer, submersible drainage pumps, and harvest pumps for live shrimp transfer.

Sizing & power

We size aeration to 28-32 HP/ha for intensive vannamei and 12-18 HP/ha for semi-intensive. Pump sizing depends on pond layout, head and turnover targets.

Receber Cotações Gratuitas

Nós buscamos. Você decide. Identidade dos fornecedores permanece privada até a seleção.

Smart questions

Fish farm project details

Lets suppliers scope tanks, cages, aeration, feeders and water treatment for your species and site.

Documents that help us quote faster

Optional — you can email them after or bring them to the first call. Uploads are private and encrypted.

  • Site photos or coordinates
  • Water analysis (DO, pH, temperature, ammonia)
  • Existing licenses / aquaculture permits
  • Business plan or feasibility summary (if available)

Not sure what to write? Answer a few quick questions and our AI builds the brief for you.

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Financing Disclaimer: FishMatch Group is not a lender, bank, financial institution, credit provider, investment advisor, or regulated financial services provider. Financing options, where available, are offered exclusively by independent third-party providers. Financing is not guaranteed. See Terms.

Perguntas frequentes

FishMatch Group é um concierge independente de sourcing, não é banco nem credor. Financiamentos são intermediados por parceiros licenciados, sujeitos a análise de crédito.

Get Free QuotesFinancing