عالمي · توريد سري

مضخات ومهويات الروبيان

خدمة توريد عالمية سرية لـ مضخات ومهويات الروبيان.

تمويل حتى 50 مليون دولار — رهناً بالموافقة الائتمانية

ما هو مشمول

Paddlewheel, propeller, aspirator and central blower aerators
Pond drainage, harvest and recirculation pumps
Energy-efficient designs with VFD options
Container-load pricing for project quantities
أسماء الموردين سرية
مشترون في 40+ دولة
تمويل المعدات والمشاريع

كيف نعمل

Aeration types

Paddlewheel (1-3 HP) for surface mixing, aspirators for vertical mixing, propeller aerators for circulation, and central blower + diffuser systems for high-density intensive ponds.

Pump scope

Centrifugal water pumps, axial flow pumps for high-volume low-head transfer, submersible drainage pumps, and harvest pumps for live shrimp transfer.

Sizing & power

We size aeration to 28-32 HP/ha for intensive vannamei and 12-18 HP/ha for semi-intensive. Pump sizing depends on pond layout, head and turnover targets.

احصل على عروض أسعار مجانية

نحن نبحث. أنت تقرر. تبقى هوية الموردين سرية حتى اختيارك.

Smart questions

Fish farm project details

Lets suppliers scope tanks, cages, aeration, feeders and water treatment for your species and site.

Documents that help us quote faster

Optional — you can email them after or bring them to the first call. Uploads are private and encrypted.

  • Site photos or coordinates
  • Water analysis (DO, pH, temperature, ammonia)
  • Existing licenses / aquaculture permits
  • Business plan or feasibility summary (if available)

Not sure what to write? Answer a few quick questions and our AI builds the brief for you.

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Financing Disclaimer: FishMatch Group is not a lender, bank, financial institution, credit provider, investment advisor, or regulated financial services provider. Financing options, where available, are offered exclusively by independent third-party providers. Financing is not guaranteed. See Terms.

الأسئلة الشائعة

FishMatch Group هي شركة توريد مستقلة وليست بنكاً أو جهة إقراض. يتم ترتيب التمويل عبر شركاء مرخصين رهناً بالموافقة الائتمانية.

Get Free QuotesFinancing