グローバル · 機密調達
エビ用エアレーター・ポンプ
グローバル機密調達コンシェルジュ: エビ用エアレーター・ポンプ.
提供内容
業務フロー
Aeration types
Paddlewheel (1-3 HP) for surface mixing, aspirators for vertical mixing, propeller aerators for circulation, and central blower + diffuser systems for high-density intensive ponds.
Pump scope
Centrifugal water pumps, axial flow pumps for high-volume low-head transfer, submersible drainage pumps, and harvest pumps for live shrimp transfer.
Sizing & power
We size aeration to 28-32 HP/ha for intensive vannamei and 12-18 HP/ha for semi-intensive. Pump sizing depends on pond layout, head and turnover targets.
無料見積を取得
調達は当社、決定はお客様。ご選定までサプライヤー名は機密です。
Financing Disclaimer: FishMatch Group is not a lender, bank, financial institution, credit provider, investment advisor, or regulated financial services provider. Financing options, where available, are offered exclusively by independent third-party providers. Financing is not guaranteed. See Terms.
よくある質問
FishMatch Groupは独立した調達コンシェルジュであり、銀行や融資業者ではありません。融資はライセンスを持つパートナーを通じて手配され、与信審査の対象となります。