Project archetype · Solar shrimp

100-Ton Solar-Hybrid Shrimp Farm

A neutral reference architecture for a 100 t/year semi-intensive whiteleg shrimp farm powered by a solar-hybrid (PV + LFP battery + diesel backup) plant. Covers pond layout, aeration, water treatment, PV sizing, battery autonomy, project stages, main cost drivers and bankability. No brand names, no fixed profitability promises.

Project assumptions

Species
Litopenaeus vannamei (Whiteleg shrimp), semi-intensive
Production target
100 t/year live weight, 2 cycles
System
Lined earthen ponds with paddlewheel aeration + central aerators
Pond area
12–16 ha of production ponds, 0.5–1.0 ha each
Stocking density
35–60 PL/m² (semi-intensive)
Power supply
Solar PV + LFP battery + diesel backup (hybrid)
Peak electrical load
180–260 kW (mostly aeration)
Water source
Coastal / brackish, filtered intake + reservoir
Location profile
High-irradiance coastal or inland brackish site
Project readiness score

Score your project in 60 seconds

Set your current status on seven factors. We calculate a 0–100 readiness score, flag gaps EPCs and lenders will raise, and pre-fill an RFQ your concierge can act on immediately.

40
/ 100
planning

Planning — foundational work still open, but structured RFQs feasible

Strengths
  • Energy plan: Grid connection secured
  • CAPEX clarity: USD 2M–10M — mid commercial
Do next
  • Sign a site option or lease for at least 20 years
  • Commission water lab tests (salinity, TAN, iron, TDS) and file abstraction permit
  • Engage local permitting consultant and file EIA scoping
  • Secure at least one signed LOI from a processor or importer

Indicative execution readiness. Not a credit decision or engineering warranty.

System stack

Ponds & water infrastructure

  • 12–16 lined earthen ponds (HDPE liner recommended for biosecurity)
  • Central drain harvest sumps + independent inlet/outlet channels
  • Reservoir + sedimentation pond for intake water
  • Effluent settling + treatment pond before discharge

Aeration & oxygenation

  • 8–14 paddlewheels per hectare depending on stocking density
  • Central aspirators or nano-bubble diffusers in intensive ponds
  • Continuous DO monitoring with SCADA-linked alarms
  • Aeration is the #1 electrical load — sized as critical

Water treatment & biosecurity

  • Drum or disc filters + UV on incoming water
  • SPF post-larvae only; two qualified hatchery sources
  • Foot baths, vehicle wash, all-in/all-out per pond block
  • Biofloc or probiotic dosing (optional, semi-intensive)

Solar PV plant

  • 250–400 kWp ground-mount PV array (bifacial modules)
  • Grid-tied or off-grid hybrid inverters, 3-phase
  • PV sized to cover 60–85% of daytime aeration load
  • Anti-corrosion mounting for coastal salt air

Battery & backup power

  • 300–600 kWh LFP battery for evening aeration + night ride-through
  • Diesel genset (150–250 kVA) sized for full critical load, N+1
  • ATS + synchronising switchgear; SCADA-integrated fuel management
  • UPS on sensors, alarms and SCADA controllers

Monitoring & feeding

  • Continuous DO, temperature, pH, salinity per pond
  • Acoustic feeders or automatic belt feeders
  • Remote monitoring dashboard + mobile alerts
  • Growth sampling + feed adjustment protocol
Interactive tools

Model this project on the page

Adjust the inputs to match your site and load profile. Outputs update live and can be sent as a pre-filled, confidential RFQ to project-matched suppliers.

Embedded tool

Solar ROI & Payback (Load + Diesel + Tariff)

Purpose-built for solar-hybrid aquaculture: enter your daily load profile, required battery autonomy, grid tariff and diesel assumptions. The tool sizes PV + battery, computes annual grid + diesel savings and returns simple payback and 10-year ROI.

24h average energy demand across pumps, aeration, RAS, hatchery.

Fraction of annual kWh covered by PV (after losses).

Of the non-solar kWh: how much comes from grid vs. diesel.

Typical 3.0–3.8 kWh per litre for well-loaded generators.

Aeration, biofilter, alarms — the loads batteries must ride through.

PV size required
108 kWp
to cover 55% of annual load
Battery nameplate
120.2 kWh
LFP, 8h autonomy on 12 kW critical load
Total CAPEX (PV + battery)
$151,701
PV $97,633 · Battery $54,068
Annual solar generation
160,600 kWh/yr
Diesel litres avoided / yr
18,894 L
at 3.4 kWh/L genset yield
Annual savings (blended)
$38,128
blended $0/kWh (grid $0 · diesel $0)
Simple payback
4 years
10-year ROI
151%
Sensitivity analysis

How ROI changes when tariff, diesel and autonomy shift

Grid values recompute live. Lower payback = better; higher ROI = better. Anchored on your current inputs.

Tariff ↓ / Diesel →$0.66/L$0.88/L$1.10/L$1.32/L$1.54/L
$0.11/kWh6.6 years5.6 years4.9 years4.3 years3.8 years
$0.14/kWh5.8 years5 years4.4 years3.9 years3.5 years
$0.18/kWh5.1 years4.5 years4 years3.6 years3.3 years
$0.22/kWh4.6 years4.1 years3.6 years3.3 years3 years
$0.25/kWh4.1 years3.7 years3.4 years3.1 years2.8 years
Tariff sweep
Payback (gold) vs 10-yr ROI (emerald) as grid tariff varies
base4.9y0.0y197%0%$0.11$0.25
Payback (yrs) 10-yr ROI (%)
Diesel sweep
Payback (gold) vs 10-yr ROI (emerald) as diesel price varies
base5.1y0.0y206%0%$0.66/L$1.54/L
Payback (yrs) 10-yr ROI (%)
Best Mid Worst Your current inputs

Estimates Only: This calculator is provided for general informational purposes only. Results are approximate and may contain errors, omissions, or outdated information. They do not constitute legal, financial, engineering, tax, technical, or professional advice. Users are solely responsible for independently verifying all calculations, specifications, prices, regulations, and requirements with qualified professionals before making any decisions. By using this calculator, you acknowledge that the website owners, operators, and affiliates accept no responsibility or liability for any loss, damage, or decisions resulting from its use.

Embedded tool

Solar Aquaculture ROI Calculator

Solar PV cuts pumping, aeration and RAS energy bills 30–90% on well-sited farms. This tool estimates annual generation, energy savings, payback years and 10-year ROI from CAPEX, irradiance and grid tariff.

Annual generation
148,044 kWh/yr
148 MWh/yr
Annual energy savings
$26,648
System CAPEX
$90,000
$900/kWp installed
Simple payback
3.4 years
10-year ROI
196%

Estimates Only: This calculator is provided for general informational purposes only. Results are approximate and may contain errors, omissions, or outdated information. They do not constitute legal, financial, engineering, tax, technical, or professional advice. Users are solely responsible for independently verifying all calculations, specifications, prices, regulations, and requirements with qualified professionals before making any decisions. By using this calculator, you acknowledge that the website owners, operators, and affiliates accept no responsibility or liability for any loss, damage, or decisions resulting from its use.

Embedded tool

Battery Storage Sizing Calculator

Aquaculture critical loads — oxygenation, biofilter pumps, alarms — cannot tolerate outages. This tool sizes an LFP battery bank in kWh from critical-load kW, autonomy hours and depth-of-discharge (DoD).

Usable energy required
102.1 kWh
Battery nameplate
120.2 kWh
LFP, DoD 85%
Estimated CAPEX
$54,068
@ $450/kWh installed

Estimates Only: This calculator is provided for general informational purposes only. Results are approximate and may contain errors, omissions, or outdated information. They do not constitute legal, financial, engineering, tax, technical, or professional advice. Users are solely responsible for independently verifying all calculations, specifications, prices, regulations, and requirements with qualified professionals before making any decisions. By using this calculator, you acknowledge that the website owners, operators, and affiliates accept no responsibility or liability for any loss, damage, or decisions resulting from its use.

Solar ROI & battery sizing

Solar ROI and battery sizing for a 100-ton shrimp farm

Aeration is the single largest energy load on a shrimp farm and it never stops. That makes shrimp one of the highest-return use cases for solar + battery in aquaculture — but only if the PV array is sized against the real 24-hour aeration profile, and the battery is sized against the longest no-PV window, not the average day.

Solar ROI drivers

Diesel displacement is the biggest lever

Every liter of diesel avoided at $1.00–$1.60/L compounds across 20 years. On tropical sites, PV + battery typically displaces 60–90% of diesel consumption, driving 3.5–5.5-year simple payback on the energy block.

Irradiance and tariff decide the base case

5.0–6.0 kWh/m²/day sites hit 14–22% 20-year IRR in the Base scenario of the Solar ROI calculator. Below 4.2 kWh/m²/day or on subsidized-diesel grids, payback stretches beyond 7 years.

Aeration is a 24/7 load, not a daytime load

Sizing PV alone against average daytime consumption undersizes the system for shrimp. Size the array against total daily kWh × 1.15 losses, then let the battery bridge the night.

Model three scenarios before financing

Use Pessimistic (low irradiance, high CAPEX, low fuel), Base and Optimistic in the Solar ROI calculator. Lenders want the Pessimistic case to still cover DSCR ≥ 1.30.

Battery sizing drivers

Size from the critical load, not the total load

Emergency aeration for 100-ton production is typically 60–75% of peak farm load. Battery kWh = critical kW × autonomy hours ÷ depth-of-discharge (0.90 for LFP).

8–12 hours autonomy for hybrid, 16–24 h for off-grid

A hybrid farm with a small backup genset only needs to cover the nightly gap. Zero-diesel targets need to survive back-to-back cloudy days, which typically doubles the kWh.

LFP dominates on total cost of ownership

6,000–10,000 cycles at 90–95% DoD means one LFP bank outlives 3–4 lead-acid replacements. TCO over 10 years is 30–50% lower despite higher CAPEX.

Round-trip efficiency matters at scale

A 92% round-trip LFP system delivers ~8% more useful energy per PV kWh than an 85% lead-acid system — which directly shrinks the PV array required for the same aeration hours.

Key inputs to get right

Solar ROI and battery sizing outputs are only as good as four core inputs. Small changes here move CAPEX, payback and diesel offset by 20–40%.

Load profile (24h kW curve)

Hour-by-hour demand of aerators, pumps, RAS loops, chillers, lighting and hatchery equipment. Peak vs. average and day/night split decide PV size, inverter rating and how much battery you actually need.

Autonomy hours

How long critical loads (aeration, oxygenation, biofilter circulation) must run with no sun and no grid. Typical: 4–8h for grid-tied hybrid, 12–24h for remote off-grid. Every extra hour multiplies battery CAPEX.

Battery chemistry

LFP (LiFePO₄) for most aquaculture sites — 6,000+ cycles, safer thermal profile, 80–90% usable depth of discharge. NMC only where energy density matters. Lead-acid rarely justified except for very short backup windows.

Tariff & diesel assumptions

Grid tariff (USD/kWh), diesel price (USD/L), genset efficiency (kWh/L), any time-of-use or demand charges, and expected annual escalation. These drive the avoided-cost side of the ROI model and separate a 4-year payback from a 9-year one.

Battery sizing walkthrough

From load profile to a bankable battery spec — in 5 steps

Use this walkthrough to translate your 24-hour load curve into a defensible chemistry, usable-kWh and autonomy spec you can drop straight into an RFQ. All five steps map to inputs in the embedded Solar ROI + Payback and Battery Storage calculators above.

  1. 1
    Isolate the critical load, not the total load

    Split your 24 h kW curve into critical (aeration, oxygenation, biofilter circulation, incubators, alarms) and comfort (lighting, office, non-essential pumps). Battery sizing works off the critical curve only — usually 60–75% of peak farm load. Comfort loads get shed automatically when the battery falls below the reserve threshold.

  2. 2
    Choose autonomy hours from the biology, not a round number

    Grid-tied hybrid with genset backup: 4–8 h. Off-grid or unreliable grid: 12–24 h. Hatcheries and broodstock: 16–48 h. Anchor the number to two hard limits — the biofilter's safe no-flow window (nitrification integrity, typically 30–60 min) and the dissolved-oxygen ride-through of your densest pond or tank. Every extra hour multiplies battery CAPEX almost linearly.

  3. 3
    Pick chemistry — default to LFP

    LFP (LiFePO₄) is the default for aquaculture: 6,000–10,000 cycles, 90–95% usable depth-of-discharge, safe thermal profile near live animals, and 30–50% lower 10-year TCO than lead-acid despite higher CAPEX. NMC only where energy density matters (rare on a fixed site). Lead-acid is only defensible for very small (<50 kWh) UPS blocks on SCADA and alarms.

  4. 4
    Convert to usable kWh with the sizing formula

    Usable kWh = Critical kW × Autonomy hours ÷ Depth-of-Discharge ÷ Round-trip efficiency. For LFP use DoD = 0.90 and round-trip = 0.92. Example: 120 kW critical × 10 h ÷ 0.90 ÷ 0.92 ≈ 1,450 kWh usable. Nameplate kWh is that number ÷ DoD again if the vendor quotes gross capacity — always confirm which one the datasheet lists.

  5. 5
    Stress-test against Pessimistic / Base / Optimistic

    Rerun the Solar ROI + Payback calculator with lower irradiance (−15%), higher CAPEX (+15%) and lower fuel/tariff (−20%). The Pessimistic case must still deliver DSCR ≥ 1.30 for senior debt and keep autonomy above the biological minimum. If it doesn't, either shrink comfort loads, add PV, or reduce autonomy hours — not the critical-load battery.

Indicative sizing method for concept-stage budgeting. Confirm final chemistry, kWh and inverter architecture with a qualified electrical engineer before financing.

Project stages

  1. 1. Feasibility & site assessment
    Irradiance analysis, water quality, tidal / salinity data, permits, indicative CAPEX/OPEX. 4–8 weeks.
  2. 2. Concept & basic design
    Pond layout, aeration & water balance, PV + battery sizing, budget class 3. 6–10 weeks.
  3. 3. Neutral RFQ
    Project-matched vendors for ponds/civil, aeration, water treatment, PV + battery hybrid, genset, controls. 8–12 weeks.
  4. 4. Detailed engineering
    P&IDs, pond civil drawings, PV single-line, control philosophy. 8–12 weeks.
  5. 5. Construction & installation
    Pond excavation, liner, aeration, PV array, battery room, genset, SCADA. 6–10 months.
  6. 6. Commissioning & biological start-up
    Water fill, water conditioning, first PL stocking. 2–4 months.
  7. 7. Full production
    100 t/year reached over first 2 cycles (12–18 months).

Main CAPEX drivers

Indicative share of total installed cost. Actual split varies by region, redundancy, automation and civil scope.

Pond civil works & liners22–30%
Solar PV plant (modules + inverters + BOS)18–26%
LFP battery storage + BMS10–16%
Aeration & water treatment equipment12–18%
Diesel genset + switchgear + ATS4–8%
Monitoring, SCADA & sensors3–6%
Engineering, permits & project management6–10%
Contingency (recommended)10–15%
Indicative class-4 ranges only. Confirm with a class-3 budget via a neutral RFQ before financing.

Bankability questions

  • Is the site's annual solar irradiance (kWh/m²/year) verified with satellite + on-site data?
  • Is the water source characterized (salinity, temperature, seasonality) and permitted for withdrawal and discharge?
  • Is aeration load modeled hour-by-hour to correctly size PV, battery and diesel backup?
  • Is SPF post-larvae supply secured with at least two qualified hatcheries?
  • Is a qualified farm operator identified with prior semi-intensive shrimp experience?
  • Is CAPEX supported by class-3 estimates from at least two independent RFQ respondents?
  • Is 10-year fuel savings from PV + battery modeled at pessimistic, base and optimistic scenarios?
  • Is the financing structure matched to project ramp-up cash flow (senior debt + green / blue-economy tranche)?

Key project risks

  • Aeration under-sizing = mass mortality. Never cut PV/battery scope below full critical load.
  • PL quality variability materially affects survival — dual-source and screen.
  • Diesel price volatility is a positive lever here (PV hedges it), but insurance and O&M discipline matter.
  • Pond biosecurity discipline is the difference between profit and loss.

Common questions

Bankability brief

Get the bankability brief — 100-Ton Solar-Hybrid Shrimp Farm

6-page investor-grade brief: CAPEX bands, OPEX assumptions, revenue model, sensitivity, risk register and a country permit map — tailored to this archetype. Free, sent to your inbox and printable to PDF.

No spam. Used only to send the brief and route your project to the right concierge.

Ready to move forward

Turn this 100-Ton Solar-Hybrid Shrimp Farm archetype into a real RFQ

FishMatch Group prepares a neutral, confidential brief based on the assumptions, system stack and cost drivers on this page — then matches you with 1–3 project-matched international suppliers or EPC partners. Supplier identities stay private until you approve them. Buyers never pay.

1
Share your project brief

Answer a short guided form — species, capacity, site, timeline, budget range. Takes ~3 minutes. Fully confidential.

2
We run supplier-neutral outreach

Our team screens project-matched providers globally and prepares a comparable, budget-grade RFQ package for each.

3
Compare 1–3 matched offers

You receive shortlisted proposals with technical, commercial and financing terms — ready for board or lender review.

Confidential · Supplier-neutral · No buyer fees · Response within 1 business day

Get Free QuotesFinancing