Water Treatment
Drum filters, biofilters, UV, ozone, denitrification and effluent treatment.
Water and effluent treatment delivered as an engineered project — design basis, permitting, installation and performance verification.
70+ water-treatment specialists
Private & anonymized
Zero
What we source
Engineered water treatment for RAS, hatcheries and processing plants — intake, recirculation and effluent.
- Drum & disc filters
- Moving-bed biofilters (MBBR)
- UV & ozone disinfection
- Denitrification reactors
- Effluent & sludge treatment
We develop complete commercial projects — not just equipment packages
Water treatment is rarely a component purchase; it is a permitting and process-engineering problem. We deliver the full scope: influent and effluent characterisation, treatment process selection and sizing, discharge-permit alignment, budget and financing, tendering, installation supervision and verified performance testing.
- Phase 1
Feasibility & site assessment
Influent/effluent characterisation, discharge limits and regulatory review.
- Phase 2
Concept & engineering design
Process selection and sizing — filtration, biofiltration, disinfection, denitrification, sludge.
- Phase 3
CAPEX / OPEX modelling & financing
CAPEX and energy/chemical OPEX modelling for the full treatment train.
- Phase 4
Tendering & supplier selection
Vendor-agnostic tendering and technical scoring of competing treatment trains.
- Phase 5
Construction & installation
Installation, integration into the production loop and instrumentation set-up.
- Phase 6
Commissioning, training & operations
Performance testing against permit limits, SOPs and operator training.
What you receive
- Water and effluent design basis
- Permit-aligned treatment process specification
- Energy and consumables OPEX model
- Vendor-neutral tender and scoring matrix
- Commissioning and compliance verification plan
Private by design.
You'll never see supplier names. We run a sealed-bid process and present anonymized proposals — you choose the winner, we handle the introduction and the contract.
Water treatment — sizing & sourcing FAQ
How to specify mechanical, biological, UV and oxygen systems for aquaculture without over-engineering the plant.
Ready to price it?
Start a private, anonymized RFQ.
1–3 shortlisted proposals. Zero buyer fees. Suppliers stay confidential until you choose.
Related categories
equipment
Aquaculture Equipment
Tanks, pumps, sensors, sorters, harvesters — every category, anonymized sourcing.
equipment
Processing Equipment
Stunning, gutting, filleting, smoking, IQF and packaging lines.
equipment
Aeration & Oxygenation
Paddlewheels, diffusers, LOX, oxygen cones and emergency systems.
equipment
Mechanical Filtration
Drum filters, disc filters and micro-screens for solids removal in RAS and flow-through.