Full project development

RAS – Recirculating Aquaculture Systems

Land-based recirculating systems for salmon, trout, shrimp and high-value species.

Full-scope RAS project development — feasibility, engineering, financing, construction and commissioning — not equipment supply alone.

Network

60+ verified RAS engineering partners

Process

Private & anonymized

Buyer fees

Zero

What we source

FishMatch Group sources turn-key and modular RAS projects from tier-1 engineering houses. We cover smolt, post-smolt and full grow-out facilities — including biofilters, oxygenation, denitrification, sludge handling and SCADA.

  • Drum filters & MBBR biofilters
  • LOX / oxygen cones
  • UV & ozone disinfection
  • Denitrification reactors
  • PLC / SCADA controls
Beyond equipment

We develop complete commercial projects — not just equipment packages

A recirculating aquaculture facility is a construction and biology project before it is an equipment purchase. We support organisations across the entire RAS project lifecycle: site and water assessment, mass-balance and process design, CAPEX/OPEX modelling, financing review, competitive tendering, build supervision and biological start-up.

  1. Phase 1

    Feasibility & site assessment

    Water source, energy, effluent permitting and site suitability for land-based production.

  2. Phase 2

    Concept & engineering design

    Mass balance, biofilter and oxygen sizing, tank layout, redundancy and SCADA philosophy.

  3. Phase 3

    CAPEX / OPEX modelling & financing

    Full build cost model, energy and labour OPEX, sensitivity analysis and bankability review.

  4. Phase 4

    Tendering & supplier selection

    Structured tender packages, anonymised comparable bids and technical scoring against your design.

  5. Phase 5

    Construction & installation

    Civil works, mechanical installation, water-loop integration and inspection milestones.

  6. Phase 6

    Commissioning, training & operations

    System start-up, biofilter maturation, operator training and first production cycle support.

What you receive

  • Process design basis and mass-balance sizing
  • Bankable CAPEX/OPEX model with sensitivity cases
  • Tender documents and scored bid comparison
  • Construction and commissioning milestone plan
  • Operator training and biosecurity protocols

Private by design.

You'll never see supplier names. We run a sealed-bid process and present anonymized proposals — you choose the winner, we handle the introduction and the contract.

Start private brief
FAQ

RAS systems — engineering & procurement FAQ

The most common questions on recirculating aquaculture systems, straight from active procurement briefs.

Ready to price it?

Start a private, anonymized RFQ.

1–3 shortlisted proposals. Zero buyer fees. Suppliers stay confidential until you choose.

Request quote