← FishMatch Group
Full project development

Hatcheries

Marine and freshwater hatcheries for fingerlings, smolt and post-larvae.

Turn-key hatchery project development — biosecure design, construction, genetics sourcing and production start-up.

Network

120+ hatchery engineering & genetics partners

Process

Private & anonymized

Buyer fees

Zero

What we source

FishMatch Group sources hatchery design, broodstock systems, larval rearing tanks, live-feed production and recirculation packages for marine and freshwater species.

  • Broodstock & maturation systems
  • Larval rearing tanks
  • Live-feed (rotifer, artemia, copepod) units
  • Egg incubation and counting
  • Specialist genetics partners
Beyond equipment

We develop complete commercial projects — not just equipment packages

A hatchery is the most technically demanding asset in the value chain. We cover the full project: capacity planning against your grow-out demand, biosecure layout and water-treatment design, budget and financing, tendering of engineering and genetics partners, construction supervision, and live-production start-up with trained technicians.

  1. Phase 1

    Feasibility & site assessment

    Juvenile demand modelling, water source quality and biosecurity zoning.

  2. Phase 2

    Concept & engineering design

    Broodstock, maturation, larval rearing and live-feed engineering with RAS loops.

  3. Phase 3

    CAPEX / OPEX modelling & financing

    CAPEX model, run-cost per juvenile and financing preparation.

  4. Phase 4

    Tendering & supplier selection

    Engineering, genetics and equipment tenders with anonymised bid comparison.

  5. Phase 5

    Construction & installation

    Construction, tank and water-loop installation, biosecurity barrier build-out.

  6. Phase 6

    Commissioning, training & operations

    Broodstock introduction, first larval runs, protocols and technician training.

What you receive

  • Capacity and biosecurity design basis
  • Hatchery engineering and water-treatment package
  • Cost-per-juvenile financial model
  • Genetics and equipment tender comparison
  • Start-up protocols and technician training plan

Private by design.

You'll never see supplier names. We run a sealed-bid process and present anonymized proposals — you choose the winner, we handle the introduction and the contract.

Start private brief
FAQ

Hatcheries & nurseries — sourcing FAQ

Marine and freshwater hatchery buyers ask us these first.

Ready to price it?

Start a private, anonymized RFQ.

1–3 shortlisted proposals. Zero buyer fees. Suppliers stay confidential until you choose.

Request quote

Related categories

Get Free QuotesFinancing