全球 · 保密采购

对虾生物絮团系统

全球保密采购管家: 对虾生物絮团系统.

融资高达5000万美元 — 须经信用审批

服务范围

Lined ponds with high stocking density and minimal water exchange
Heterotrophic biofloc development equipment and protocols
Suitable for arid regions, urban locations and biosecure operations
Financing for greenfield biofloc projects
供应商身份保密
覆盖40多个国家买家
设备与项目融资

我们的流程

Biofloc fundamentals

Biofloc systems maintain water quality through dense microbial communities, allowing 200-500 PL/m² stocking densities with minimal water exchange and excellent biosecurity.

Equipment package

HDPE liners, central aeration with diffusers and venturi systems, automatic feeders, settling cones, monitoring sensors and optional roof structures.

Where biofloc wins

Arid regions with limited water, urban-adjacent operations needing biosecurity, and producers serving premium markets that require traceability.

获取免费报价

我们采购。您决策。在您选定之前,供应商身份始终保密。

Smart questions

Fish farm project details

Lets suppliers scope tanks, cages, aeration, feeders and water treatment for your species and site.

Documents that help us quote faster

Optional — you can email them after or bring them to the first call. Uploads are private and encrypted.

  • Site photos or coordinates
  • Water analysis (DO, pH, temperature, ammonia)
  • Existing licenses / aquaculture permits
  • Business plan or feasibility summary (if available)

Not sure what to write? Answer a few quick questions and our AI builds the brief for you.

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Financing Disclaimer: FishMatch Group is not a lender, bank, financial institution, credit provider, investment advisor, or regulated financial services provider. Financing options, where available, are offered exclusively by independent third-party providers. Financing is not guaranteed. See Terms.

常见问题

FishMatch Group 是独立采购管家,非银行或贷款机构。融资由持牌合作伙伴安排,须经信用审批。

Get Free QuotesFinancing