Biosecurity upgrades that don't break the budget
Practical wins for foot dips, anterooms, vehicle wash-down and farm zoning when capex is tight.
You do not need a Danish-entry shower system to materially improve biosecurity. A real perimeter fence, a clean/dirty line at the anteroom, dedicated farm boots, and an enforced vehicle wash-down protocol cover most of the risk for a fraction of the cost.
