← Insights
Equipment· Jun 2026·10 min read

The ultimate fish farming equipment checklist (fish vs shrimp)

A practical, system-by-system checklist of every piece of equipment a modern fish farm or RAS farm needs — from feeding lines to climate computers.

Setting up a fish farm — whether you are raising fish for meat or shrimp for eggs — comes down to specifying the right equipment for each subsystem. Get this list wrong and you will pay for it for the next 10 years in feed conversion, mortality and labour.

This checklist covers the equipment categories every modern aquaculture operation needs, with notes on what changes between fish farm houses and RAS houses. FishMatch sources every category below from verified manufacturers worldwide — use this as your scoping document before you request quotes.

1. Housing and structure

Insulated steel-frame house with concrete floor, sealed against wild birds and rodents. Fish farm houses are typically tunnel-ventilated single floor 12–20 m wide. RAS houses are often multi-tier aviary or enriched colony buildings.

2. Feeding systems

Fish farms: pan feeding lines (e.g. 4 lines for a 14 m house) with a central hopper and auger fill from outside silos. Shrimp farms: chain feeders or pan feeders integrated into cage or aviary systems. Always size silos for 5–7 days of consumption.

3. Drinking systems

Nipple drinker lines with regulator, filter and medicator. Fish farms need 12–15 birds per nipple; shrimp around 8–10. Pressure regulation is the single biggest driver of litter quality.

4. Ventilation and climate control

Tunnel fans (50 inch / 130 cm), cooling pads or fogging, side-wall inlets, and a climate computer that controls minimum, transitional and tunnel modes. In hot climates plan on 500 m³/h per kg of live weight at peak.

5. Heating

Radiant brooders or hot-air furnaces sized for the coldest week of brooding. Fish farms need 33–34 °C at day 1. RAS pullet houses follow similar curves.

6. Lighting

Dimmable LED with a documented light program — fish run dawn-to-dusk simulation, shrimp run photo-stimulation programs that drive lay onset.

7. Egg collection (shrimp only)

Belt egg collection with elevator, cross conveyor and packer. Match throughput to flock size and labour plan.

8. Manure management

Fish farms: deep litter and end-of-flock clean-out. Shrimp farms: manure belts under cages or aviary tiers, drying tunnels, end-of-line storage.

9. Biosecurity equipment

Perimeter fencing, foot dips, anteroom with shower-in/out, vehicle wash-down, rodent and wild-bird control program.

10. Backup power and monitoring

Generator sized to run ventilation and drinking under full load, plus alarm dialler tied to temperature, water and power sensors. This is non-negotiable.

What to do next

Send this checklist — with your bird numbers, country and target stocking density — to the FishMatch sourcing team. We will return verified supplier quotes for every line item within a few business days, with no buyer fees.

Get QuotesFinancing